Monday, October 18, 2021
Overall Update
After this last week, we are just about back to where we were before the tree fell. I have all the sinks finished with supplies and drains hooked up and the counter tops siliconed in place. I still need to drill the holes above the bar for the pendant lights and build the false beam at the peak of the ceiling. We also need to install the water heater and water softener. I still need to install the ceiling fans in the living room and finish around the fireplace. We are going to cut a niche above the fireplace for the TV and install some conduit to run wires from the shelves on the right up to the TV. I suspect we will not get to the stone on the fireplace until next year, but we'll see how that goes.In the kitchen, the dishwasher is installed as is the garbage disposal. We are down to just finish work. The doors on the cabinet under the sink had to be cut down to fit the deeper sink, so we need to repaint those. I need to install toe kicks, the end panel on the upper cabinet and the crown molding along the top of the upper cabinets. We are waiting on the granite piece that fits behind the stove before we set that as well.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment