The shower pan and curb have been cemented down and sealed to the walls. The only piece left to do is the membrane that goes over the top of the curb. I have that piece cut, but I ran out of cement so I could not finish it. The drain flange is also cemented in and sealed to the pan. I have the pipe to form the trap under the floor, but I wanted to wait for the cement to cure before I attach it for fear that I would pop the drain out of the pan by pushing up on it. As you can see, the floor is also complete in the bathroom. The temporary counter top is also in place and ready for inspection.