Sunday, June 11, 2017

Bathroom

The weather was pretty rough today, so we didn't get to work outside much at all.  I got the particle board for the counter top in the bathroom cut and installed.  I also got the shower valve flipped right side up.  We had discovered that I installed it upside down.  Kelly got most of the scraping done on the front outside wall of the cabin in prep for new paint.

No comments:

Post a Comment