The weather was pretty rough today, so we didn't get to work outside much at all. I got the particle board for the counter top in the bathroom cut and installed. I also got the shower valve flipped right side up. We had discovered that I installed it upside down. Kelly got most of the scraping done on the front outside wall of the cabin in prep for new paint.
No comments:
Post a Comment