Monday, June 5, 2017

Bathroom

Here is another shot of the bathroom.  The vanity is set and leveled, all the electrical is complete and the tub spout is attached.

I still need to put a top on the vanity and set the sink, but the plumbing is all there.  We have not picked out the counter top yet, so that is probably next on the list.

We also need the hang all the towel rods, toilet paper holder, mirror and shower doors.  We do have all that stuff, I just need to take the time to put it all up.

The purple thing in the top corner of the picture is the bed sheet that is acting as the door for now.  We'll take care of that soon too.

No comments:

Post a Comment