Wednesday, August 31, 2022
Retaining Wall
Retaining Wall
The section between the gangway support and the stairs has been straightened out and pushed toward the lake 3 feet to give us more grass between the deck and the retaining wall. This has been a complaint of ours since buying the place, it is just not usable in that area.
The staircase will be much wider. By making it 12 feet wide, we will be able to drag the boat lift up the staircase and park it on the grass for the winter.
Sunday, August 28, 2022
Retaining Wall
Monday, August 22, 2022
Door Casing
Sunday, August 21, 2022
Sink Base Trim
Saturday, August 20, 2022
Sink Base Doors
Dock
Monday, August 8, 2022
Dock
Saturday, July 30, 2022
Loft Ladder
We finally got the ladder for the loft built and installed. The top of the ladder is held in place by some 3/4" pipe and flanges that are bolted into the floor joists. It is allowed to slide up and down in some slots I cut in the 2x6s at the top. The bottom swings out away from the wall when you want to use it and back in for storage so it is not in the way of the bathroom door.