We have finally started working on the trim in the cabin. We decided on a Craftsman look with 1x3 verticals and 1x4 horizontals. The casing on the living room side of the second bedroom and bathroom doors are both done and ready for a final coat of paint. The closet in the second bedroom has the jams as well as the casing on the inside installed and ready for a final coat of paint as well.
No comments:
Post a Comment