Monday, August 22, 2022

Door Casing

We have finally started working on the trim in the cabin.  We decided on a Craftsman look with 1x3 verticals and 1x4 horizontals.  The casing on the living room side of the second bedroom and bathroom doors are both done and ready for a final coat of paint.  The closet in the second bedroom has the jams as well as the casing on the inside installed and ready for a final coat of paint as well.
 

No comments:

Post a Comment