Saturday, October 16, 2021

Shower

We have decided to go with a full tile shower this time, rather than a fiberglass tub/shower combo like we had last time.  We purchased a Schluter Kerdi shower kit in order to waterproof the walls and avoid building a pan out of dry mortar.  I have the Kerdi membrane applied to the walls and the pan cut to fit.  I don't like the curbs that come with the kit, they are way too big.  So I have made our curb out of some left over cedar we had laying around.  Next step is to cement down the floor and curb and seal them to the walls.  After that, we can put in the floor in the bathroom.
 

Floor Joist Repair

When the tree fell on the cabin, some of the weight was taken up by the utility room walls.  That load was transferred to the floor and cracked 2 of the joists between the utility room and kitchen.  We found this a while back but the contractor never bothered to fix it. So I cut 2 pieces to scab in with 1/2" through bolts.
 

Wednesday, October 13, 2021

Kitchen Sink

Today I finished building the kitchen sink supports.  You can just see the leg on the front one mounted to the back of the cabinet face.  I used 3/4" square aluminum tubing and welded it together to bare the weight.  The sink is sitting on those supports and has been shimmed into place.  The top of the sink has been sealed to the counter top, but I still have to caulk the front of the sink to the face of the cabinet.
 

Tuesday, October 12, 2021

Floor

Today we took the floor as far as we can until we get a little bit more work done.  The girls bedroom is now complete, but I have to build the railing on the loft before we can finish that.  I also have to install the shower floor before we can do the bathroom.  We have the pieces all picked out and ready to be cut when we finish the needed work.
 

Sunday, October 10, 2021

Floor

We got off to a bit of a slow start before lunch today, but things picked up after that.  We managed to get the living room and our bedroom all done.  It's turning our very nicely and it does not look like we will need to use much of the flooring we saved out of the cabin.  We plan to save it for use in the bunk house when we build that.
 

Saturday, October 9, 2021

Flooring

Kelly and I have this coming week off work, so we plan to get a bunch of work done on the cabin.  We started with the floor today.  We decided to go with the same floor we had last time and we had the contractor save the stuff we took out of the cabin, so we have plenty of material to work with.  Today we got the kitchen, utility room and dining rooms all done.
 

Monday, October 4, 2021

Shower

This time around we have opted to build a full tile shower rather than a fiberglass tub/shower combo.  We always knew the original bathroom was temporary, but we figured we would get 5-10 years out of it before replacing it.  In order to put the niche in the wall under the shower head, I had to reframe part of that wall.  There was a stud that ran down the middle of that niche, so I had to cut that part out.  I also had to move a plumbing vent over inside the wall.  It now runs up the right side of the niche.  Finally, I had to add blocking in the wall to tie the shower doors into the framing so they will be nice and solid. I also had to move the shower head to the left so it is centered in the wall.  The contractor mounted it too far to the right.  Finally, I hung the drywall.  Next up is to install the Kerdi shower kit.
 

Saturday, October 2, 2021

Lighting

Friday night and Saturday I worked on the can lights in the kitchen, dining room, living room and loft.  I had to enlarge the holes that the contractor cut  in the kitchen and loft because the clips on the lights would not fit.  Then I had to cut the holes in the dining room and living room.  These lights work extremely well.  There is no humming or buzzing noise and no flickering like the last set of lights.
 

Wednesday, September 29, 2021

Paint & Lighting

The paint inside the cabin is all done!  The cabinets are all set, not just in the kitchen but also in the utility room and the bathroom.  The cabinet lighting is also installed, both under and on top.  The smoke detectors are installed as well as the ceiling fan in the second bedroom.  We still need to get new ceiling fan switches, but the fan is installed.  The microwave is also installed.
 

Sunday, September 19, 2021

Kitchen Cabinets

While Kelly was working on paint, I got the kitchen upper cabinets installed, set the lower cabinets in the utility room, and started work on the Sensi WIFI thermostat.  The power supply has been installed under the house and the wires run up to the thermostat as well as the fireplace.  I still need to hook up the relay to make it all work, but I didn't have the wiring components I needed to do it today.