The paint inside the cabin is all done! The cabinets are all set, not just in the kitchen but also in the utility room and the bathroom. The cabinet lighting is also installed, both under and on top. The smoke detectors are installed as well as the ceiling fan in the second bedroom. We still need to get new ceiling fan switches, but the fan is installed. The microwave is also installed.
No comments:
Post a Comment