The accent stripe and the nook in the shower are both done now. I have 2 more rows of tile to do, but I need to get the drywall work done where the walls meet the ceiling before I can go too much farther. The original plan was to tile to the ceiling, but I think I am going to stop 6" short so I don't have a sliver of tile at the ceiling.
No comments:
Post a Comment