Monday, April 18, 2022

Shower Floor

Now that the pre-sloped mortar bed is dry, it is time to apply the Schhluter Kerdi water proofing membrane to the floor.  The old foam pan had this membrane attached, but of course, it could not be saved.  The membrane curves up the walls on all 4 sides so I get my full 2" overlap.  It also goes over the top of the curb and down the outside all in a single piece!
 

No comments:

Post a Comment