Tuesday, November 16, 2021

Mechanical Closet

I spent some time working on the mechanical closet this weekend.  The water heater is installed as far as the pan, supply and outlet lines.  I still need to do the over pressure drain and the exhaust vent.  The radiant floor heat manifold is also attached to the wall and the trim has been built around the tubes.  The water softener is nearly ready to go in as well.  All that is left there is a drain in the floor.
 