Wednesday, September 29, 2021

Paint & Lighting

The paint inside the cabin is all done!  The cabinets are all set, not just in the kitchen but also in the utility room and the bathroom.  The cabinet lighting is also installed, both under and on top.  The smoke detectors are installed as well as the ceiling fan in the second bedroom.  We still need to get new ceiling fan switches, but the fan is installed.  The microwave is also installed.
 

Sunday, September 19, 2021

Kitchen Cabinets

While Kelly was working on paint, I got the kitchen upper cabinets installed, set the lower cabinets in the utility room, and started work on the Sensi WIFI thermostat.  The power supply has been installed under the house and the wires run up to the thermostat as well as the fireplace.  I still need to hook up the relay to make it all work, but I didn't have the wiring components I needed to do it today.  
 

Paint

It took a couple days, but the first coat of paint has been applied to every room in the cabin.  Big thanks to Brian, who came up to help yesterday.  He installed all the outlets and painted in all the corners.  Kelly worked on rolling the walls while I did the edging.  The second coat has also been applied in the kitchen and around the back side of the bar.
 

Monday, September 13, 2021

Drywall

We've let our contractor go.  I can't really say we fired him because he had already moved all his stuff out of the house and taken his trailer with him.  Either way, he will not be working on the house anymore.  So this weekend I finished the texture, wrapped the end of the wall next to the dishwasher and the doorway into the utility room with drywall.  While I was doing that, Kelly worked on priming the drywall.
 

Friday, September 3, 2021

Dock Anchors

All the anchors are in the water, the chains are hooked up and the new chain attachments are on the dock.  These new chain attachments are amazing!  They require no tools to adjust the chain length.  I pushed the dock out 10 more feet as well, so in the spring we will have to make a second floating approach, but now the boat will have plenty of water for the lift, even when the water goes way down.
 

Wednesday, September 1, 2021

Smokeless Fire Pit

The fire pit is finished.  The idea is that air enters a gap between the metal ring and the stone through spaces between the stones in the bottom course.  That air is heated by the fire rises to the top of the gap.  That hot air has nowhere to go but out the holes in the top of the metal ring.  It is so hot, it burns any smoke leaving the fire.  That draws cool air in from outside the ring and the process repeats.  We'll see how well it works this weekend.
 

Exterior Paint

The outside of the cabin is all painted.  It is not quite right, so the painters will have to come back to fix it.  The gable peaks are supposed to be blue like they were before.  While it is not right, it is very nice to finally see progress.  This is also a better shot of the new rock and the flag stones we put in around the edges of the grass.