The trench for the underground power was backfilled tonight. We plan to build a bunk house half way up the driveway, so while we had the trench open, I put a power cable in for that as well. Next up, Kootenai Electric needs to take down the overhead lines and pull the new wire. With any luck, that will be done in the next few days. Rebuilding the retaining wall may have to wait till spring though.
No comments:
Post a Comment