Saturday, May 30, 2020

Tool Shed

The trenches have been dug and filled with gravel.  The pressure treated 4x4s have been laid down and the floor frame has been built and everything is level.  The power line has been run up through the floor and we are ready for the walls to go up.  They have been pre-fabed at home, so we should get them up before the storm his this evening.

No comments:

Post a Comment