The base cabinets are all set in both the kitchen and utility room. It's not shown in this picture but the sink base is set and the supports for the apron front sink have been built.
We also picked up the floor and piled it in the girls bedroom and Kelly loaded all the garbage into the trailer, so the pile on the driveway is totally cleaned up!
No comments:
Post a Comment