Since we have a little time before the crew is ready to start hanging drywall, we decided to put down the underlayment. Since we already have 3/4" material on top of the joists, we are just putting down 1/2" CDX but we are using 2-1/2" screws into the joists and 1-1/4" everywhere else. This is making the floor so much stiffer!
No comments:
Post a Comment