Saturday, May 25, 2019

Sheathing

After lunch today, we managed to get the sheathing up, which was not easy.  The top corner near the lake is about 14' off the ground, so getting a sheet of plywood up there took some work.  We measured down from the top 4' and nailed a 2x4 to the wall parallel to the ground.  That gave us a support for the sheathing while we screwed it in place.

No comments:

Post a Comment