Gangway

We got the concrete pored around the steal frame.  It took 25 bags of 80 lb concrete mix as well as a bunch of rocks we picked out of the dirt while digging the trenches.  With the weight of the steal there is roughly 3,000 lbs on the shore side.  That will hold against wind and waves, but we will have to pull the dock and gangway out of the water to prevent the shifting ice from crushing them.