Wednesday, May 31, 2017

Bathroom

It does not look much different in the pictures, but the 3rd coat of mud is on most of the walls.  I have to let the second coat dry in a few places before I can finish.  But I should be able to finish the mud work tomorrow then do the final sanding and texture on Friday.  Which means the bathroom will be usable on Saturday.

No comments:

Post a Comment