The larger tank at the top of the property has been set and both tanks have been back filled. The trench is dug and ready for the waste line to be installed. Since we have the trench open we are going to put a 3/4" water line in 2 feet above the waste line. Then in the spring we will have the meter switched out for a 3/4" meter so we get a reasonable amount of flow in the house.
No comments:
Post a Comment