Saturday, February 25, 2017

Cabinets

Here are a couple more renderings of the kitchen.  We went to Home Depot today and sat down with a kitchen designer.  We showed him the dimensions and he came up with almost exactly the same plan I had, so that was a nice validation.  The price they gave us for painted cabinets with MDF boxes and maple frames was around $4900 + tax.
We then went to Cabinets Plus and got a price from them much better quality cabinets.  Theirs are solid wood boxes, doors and drawers.  There is no MDF in these things.  We wound up buying the ones at Cabinets Plus today for $3400 including tax!  Like the price at Home Depot, this includes the bathroom vanity and cabinets in the laundry room as well.

Wednesday, February 22, 2017

New Kitchen Plan

After a little tweaking, I have come up with what I think is a really good plan for the kitchen.  We are going to move the stove to the wall that faces west.  That will allow us to put up a micro-hood  so we will not lose counter space to the microwave.  We will also change to full corner cabinets both top and bottom rather than blind corners.
The dishwasher will be moved to the wall that faces the dining area and the lake.  This will allow us to keep the larger window and the dishwasher will be next to the sink.  The whole thing feels much more fluid and usable than the previous plan.  Using off the shelf products, there is very little wasted space.

Thursday, February 16, 2017

Septic System

The county inspected the septic system today and approved everything.  One of the neighbors suggested we keep the outhouse for emergency purposes, but the county made us take it out.  I was a little unsure that I really wanted to keep it anyway.  The previous owners can come get their stuff as soon as the ground settles a little bit, probably in a couple weeks.

Wednesday, February 15, 2017

Septic System

The larger tank at the top of the property has been set and both tanks have been back filled.  The trench is dug and ready for the waste line to be installed.  Since we have the trench open we are going to put a 3/4" water line in 2 feet above the waste line.  Then in the spring we will have the meter switched out for a 3/4" meter so we get a reasonable amount of flow in the house.

Tuesday, February 14, 2017

Septic Tank

The guys got the small septic tank installed today.  This tank is just outside the kitchen window and will contain a grinder pump that will transfer the waste to the larger tank that is up by the road.  The drain field will then be gravity fed by the upper tank.  They hope to have the trench connecting the 2 tanks dug today and the upper tank set in the ground tomorrow.

Friday, February 10, 2017

Perk Test

We had the perk test done on the lake house today and the soil looks great!  The original plan was for a 100' Presby drain field, but because the soil looks so good we will get away with only 50' of a standard drain filed.  That should save us a few thousand dollars.  We will have the permit today and the system will be installed starting Monday!