Since we had to take it all apart anyway, we decided to make the window in our bedroom considerably bigger. It will now be almost 1/2 again as tall and 6" wider. We will still have a single hung on each side with a picture window in the middle, but there will not be any mullions between them this time around. Now I think we need to talk about taking out the tree.
Thursday, May 6, 2021
Monday, May 3, 2021
Radiant Floor Heat
The grid for the radiant floor heat is completely finished throughout the cabin. We plan to install the heat transfer plates and the tubing next weekend or the one after. I'm still trying to plan when we hook up the manifold. I need to call the state about a permit, so that may dictate when we hook it up. If I can, I would like to wait until the drywall is done though. We would get a much better finish if we can wait.
Saturday, May 1, 2021
Retaining Wall
The girls came up to help us at the cabin this morning. While I was getting some of the flooring done, Kelly and the girls worked on preparing to fix the retaining wall outside their bedroom window. We had to take this part of the wall apart to run the power underground. All we need to do now is put down the concrete mix for a base and stack the blocks.
Wednesday, April 28, 2021
Radiant Floor Heat
Today I finished the grid layout in the living room. We have a bunch of heat transfer plates that fit down inside these grooves and then the pipe snaps into heat transfer plates. Once all the piping is run a layer of 1/4" plywood will cover the whole thing up and act as the underlayment for the finished floor. This process is called a sandwich install.
Tuesday, April 27, 2021
Radiant Floor Heat
Since we had to take the flooring out, I decided I am not going to miss the chance to do the radiant floor heat this time around. I've done a bunch of research and found an expert that is willing to help me with the design to make sure I get it right. Today I finished the grind layout in the dining room.
Thursday, April 22, 2021
Sheathing
The trusses over the main part of the cabin are done as well as the section over our bedroom. Both the street and lake sides are sheathed, but they are still working on framing the transition to our bedroom. Once that is done they can finish the sheathing and get the ice & water shield put down. We are still on track for being weather tight, mostly, by tomorrow.
Tuesday, April 20, 2021
Trusses
The rest of the roof has been torn off and they top caps repaired. It took quite a bit of work to get the walls plumbed and the caps leveled, but it turned out well. The trusses over out bedroom and part of the girls bedroom are done. The rest should go up tomorrow. With any luck it should be mostly weathered in by Friday.
Monday, April 12, 2021
More Demolition
The contractor started taking the roof off the cabin today. I still can't believe all that hard work is being undone. At the same time, it is really nice to see progress, so maybe we can use it for the majority of the summer! They are still telling me 2 months, which in contractor time means 3-4 months. That puts us into July or August, but we will still get to use it this year.
Friday, April 9, 2021
Wednesday, April 7, 2021
More Demolition
We have been fighting with the county and the insurance company for 2 months to get the cabin fixed, but we finally have the permit and the insurance company is coming around as well.
The demolition is nearly complete for the second time in 4 years. It's very sad to see it back at this stage, but it will be really nice, in fact better than before, when it's done.
The demolition is nearly complete for the second time in 4 years. It's very sad to see it back at this stage, but it will be really nice, in fact better than before, when it's done.