Monday, March 14, 2022

Gangway

Both 10' sections of the gangway are built as well as the brackets used to hold them together.  I have most of the materials to build the hinges for both ends of the gangway, so I will start on those this week.  I still need to get the steel to make the new bar for the retaining wall and add the hinges to that.  We have a couple months before we can put it in the water though, so we have plenty of time.
 

Barn Door Install

We found this sliding barn door at Costco last weekend.  For $217 it came pre-finished white, with all hardware and soft open/close rollers.  The handle matches the hardware in the kitchen and the install was easy.  I did have to cut the roller bar and backer board down, because they were longer than the wall we mounted it on, but even that was easy.
 

Saturday, March 12, 2022

Living Room Chair

We finally found a chair for the living room.  I think we will wind up replacing the ottoman with a longer one or with a coffee table.  But this will work for now.  We also picked up so small tables at Costco.  They are supposed to be night stands, but the will work well as end-tables because the living room is so small.