I finished the first half of the gangway frame this weekend. We still need to re-stain the deck boards and attach them, but I don't want to do that until we have it assembled and on the dock. I also need to fabricate the mounts that will hold it on the dock and the retaining wall. I'll do that after I finish the second half.