Tom and I met up at the lake today to get some more of the plumbing work knocked out. He fixed the washing machine drain while I worked on the pressure relief drain line for the water heater. I originally ran it in PEX pipe, but the plumbing inspector made me replace it with CPVC instead. So the only 2 things left before inspection now are the pipe hangers to support the pipe ever 4 feet and I need to trim the counter top in the bathroom so we have 15 inches of clearance between that and the center of the toilet. We are about an inch short right now.
I snapped this picture on my way in to the cabin. It's much more interesting than a pile full of pipes, so I figured I would use it for this post. Things are warming up but there is still a ton of snow up there.